Electra Tower in Tel Aviv


The basement floors are excavated close to the existing using diaphragm shoring walls with pre stressed anchors.
During the excavation the water level was lowered using well points and deep wells.
The foundation is on a piled raft system.

בניית אתרים
Jump to page content